Not an expert but Lynas had a lot of engineering problems post plant approval that delayed production. Missed a lot of targets. Long time to get to $10
engineering and tropical environments ain’t easy
happy of course to be wrong but in this case the fat lady is production figures from plant 1 and she ain’t started singing yet. Perhaps that’s why our ceo is in brissy at the conference perhaps he is looking for a fat lady to sing - (sorry low blow - intended to be humour).
When she does of course bring on $2+ per share! when? See my previous post end of June/July.
keep in mind - I’m very very happy to be wrong.
- Forums
- ASX - By Stock
- KCN
- Ann: Green Light for Plant 1 at the Chatree Gold Mine
Ann: Green Light for Plant 1 at the Chatree Gold Mine, page-134
-
- There are more pages in this discussion • 35 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KCN (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.47 |
Change
0.090(6.52%) |
Mkt cap ! $378.8M |
Open | High | Low | Value | Volume |
$1.41 | $1.48 | $1.40 | $1.121M | 773.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 549 | $1.47 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.48 | 903 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 549 | 1.470 |
1 | 9800 | 1.460 |
1 | 3000 | 1.455 |
2 | 4641 | 1.450 |
6 | 3768 | 1.445 |
Price($) | Vol. | No. |
---|---|---|
1.480 | 903 | 2 |
1.485 | 3291 | 1 |
1.490 | 8220 | 4 |
1.495 | 10791 | 2 |
1.500 | 9030 | 3 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
KCN (ASX) Chart |