No, they are at the same stage as RWD but without the need to address public comments.
I guess they could have more work to do if the EPA tells them but I assume they made sure they knew what was required before they lodged their ERD.
Note they changed their proposal after they submitted the ERD.
http://www.epa.wa.gov.au/proposals/beyondie-sulphate-potash-project
- Forums
- ASX - By Stock
- Ann: Greenstone Resources A$20.8 million Cornerstone Investment
No, they are at the same stage as RWD but without the need to...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$7.28 |
Change
0.000(0.00%) |
Mkt cap ! $2.499M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KLL (ASX) Chart |
Day chart unavailable