Thats a good question mconsult. Theres a lot of good questions and i think people need to stop being so lenient on management. The max capacity for phase 1 is 200k per annum but to my knowledge this much has been utilized to capacity nor has the plant been consistently running for any real length of time since they were mining a couple years ago. It was only for very small sales and sample batches that it ran at all late last year. From what i know mining has also been non existant since the mining contractor stopped due to 'breakdowns' or something similar and never got around to restarting and that was years ago
- Forums
- ASX - By Stock
- Ann: Grid Power Connection Sanctioned by AP Govt
Thats a good question mconsult. Theres a lot of good questions...
-
- There are more pages in this discussion • 48 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ELE (ASX) to my watchlist
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $24.27M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ELE (ASX) Chart |
Day chart unavailable