Do we not have 7000m of drilling underway?
With new rig doing night and day operations at Esker to compete before hunting season on the 15th?
On that, how long are we expecting that area to be closed to traditional owners before the rig can be back in place?
- Forums
- ASX - By Stock
- Ann: GT1: Further Thick, High-Grade Ext Intercepts at Seymour
Do we not have 7000m of drilling underway? With new rig doing...
-
- There are more pages in this discussion • 31 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADV (ASX) to my watchlist
(20min delay)
|
|||||
Last
13.5¢ |
Change
-0.005(3.57%) |
Mkt cap ! $8.439M |
Open | High | Low | Value | Volume |
13.5¢ | 14.0¢ | 13.5¢ | $6.11K | 45.25K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 38076 | 13.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
13.5¢ | 917 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 38076 | 0.130 |
4 | 327649 | 0.125 |
4 | 126265 | 0.120 |
3 | 140867 | 0.115 |
3 | 77270 | 0.110 |
Price($) | Vol. | No. |
---|---|---|
0.135 | 917 | 1 |
0.140 | 46608 | 3 |
0.145 | 65662 | 2 |
0.150 | 52174 | 2 |
0.155 | 51016 | 3 |
Last trade - 15.50pm 30/09/2024 (20 minute delay) ? |
Featured News
ADV (ASX) Chart |