Yes, another joke from Hamish. No mention of cost of the power which is the most important item. Hamish doesn't want to scare the troups. A miserable 20 MVA for 5 years that wouldn't even power a single furnace in OM Sarawak. How does GMC plan to expand beyond those 2 x 7 MVA second hand 50 year old furnaces. At least the power bill won't be much at a minimum of US$80,000 a month for the first two years, ramping up to US$400,000/month.
It sounds like there isn't going to be much production in the first two years, as 20MVA for 40hrs/month will only produce 260 tonnes of MC FeMn that won't be enough to even pay the snouts at the trough.
Yes, another joke from Hamish. No mention of cost of the power...
Add to My Watchlist
What is My Watchlist?