FBR 11.8% 3.8¢ fbr ltd

Ann: Hadrian X builds childcare centre at Amberton Beach, page-32

  1. 1,710 Posts.
    lightbulb Created with Sketch. 444
    why dii ok you say a lot of manual labour was required to mage the residential build up to code. What manual labour are you referring to that is additional to what a conventionally built wall would require?

    Remember the hx was going to replace the labour component of actually laying the bricks. It was never intended to replace all processes involved In building the wall ready fur a client.

    not investment advice. Dyor, etc etc
 
watchlist Created with Sketch. Add FBR (ASX) to my watchlist
(20min delay)
Last
3.8¢
Change
0.004(11.8%)
Mkt cap ! $182.0M
Open High Low Value Volume
3.5¢ 3.8¢ 3.4¢ $486.4K 13.24M

Buyers (Bids)

No. Vol. Price($)
2 375015 3.7¢
 

Sellers (Offers)

Price($) Vol. No.
3.8¢ 215170 1
View Market Depth
Last trade - 16.10pm 28/08/2024 (20 minute delay) ?
FBR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.