Share
438 Posts.
lightbulb Created with Sketch. 51
clock Created with Sketch.
17/03/18
02:30
Share
Originally posted by FixItDad
↑
And here they are under promising :
The Directors have designed a plan to ensure that the production targets at Edie Creek can be achieved including making additional investments at the mine. The plan anticipates that positive cash flows from Edie Creek mine through gold and silver sales in the order of $250,000 to $300,000 per month will be achieved consistently. This approximates production at a rate of 5 to 6 ounces per day. This level of production is significantly higher than what has been consistently achieved to date. In order to achieve the production rate in the cash flow forecast, the plant needs to be running near capacity.
FID
Expand
Research of old anns
conveys periods from 22grams a tonne up to 1000grams with a much smaller operating production line.
DYOR though
FID