Fwiw,
I work for a large electrical utility (mostly poles and wires). We aren’t a Pointerra customer but the problem they solve is a real one. I can’t comment on their solution directly but I can say the sales cycle is super slow and often so is the implementation because we often demand a high level of customisation based on lots of consultation with the various stakeholders (engineering, design, legal, insurance, operations, etc etc). To get the sale and implement something would often be at least 2 years. But once you land it chances are you will stick around for a long long time. We are replacing a piece of software from the 90s currently and cracking the third year of “the build”.
I do think Pointerra management may have underestimated the glacial pace of these organisations (unless there are storms, the power is out and we are facing large regulatory fines!!)
just for some perspective.
- Forums
- ASX - By Stock
- 3DP
- Ann: Half Yearly Report and Accounts
Ann: Half Yearly Report and Accounts, page-85
-
- There are more pages in this discussion • 50 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 3DP (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.1¢ |
Change
0.001(2.50%) |
Mkt cap ! $33.00M |
Open | High | Low | Value | Volume |
4.0¢ | 4.2¢ | 3.9¢ | $5.796K | 144.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 26082 | 4.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.3¢ | 20000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 26082 | 0.040 |
3 | 289050 | 0.039 |
6 | 440815 | 0.038 |
2 | 120000 | 0.037 |
3 | 300300 | 0.036 |
Price($) | Vol. | No. |
---|---|---|
0.046 | 13500 | 1 |
0.047 | 5505 | 1 |
0.050 | 148593 | 1 |
0.051 | 102040 | 1 |
0.052 | 215000 | 1 |
Last trade - 15.55pm 08/11/2024 (20 minute delay) ? |
Featured News
3DP (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online