BM8 13.3% 17.0¢ battery age minerals ltd

Ann: Hamersley Iron Ore Project Work Program, page-20

  1. 953 Posts.
    lightbulb Created with Sketch. 141
    PF1 will be drilling the King Tut Gold Mine and Hamersley Iron ore at same time. How much more upside do you need for $5M EV. Read the resource estimates on both and you'll understand why this will boom.
 
watchlist Created with Sketch. Add BM8 (ASX) to my watchlist
(20min delay)
Last
17.0¢
Change
0.020(13.3%)
Mkt cap ! $15.81M
Open High Low Value Volume
16.0¢ 17.5¢ 16.0¢ $102.4K 609.9K

Buyers (Bids)

No. Vol. Price($)
1 1538 16.5¢
 

Sellers (Offers)

Price($) Vol. No.
17.0¢ 47706 1
View Market Depth
Last trade - 15.59pm 23/05/2024 (20 minute delay) ?
Last
17.0¢
  Change
0.020 ( 13.3 %)
Open High Low Volume
16.0¢ 17.0¢ 16.0¢ 293120
Last updated 14.59pm 23/05/2024 ?
BM8 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.