re: Ann: COE: Hammamet West-3 Production Test... Operations to free the obstruction were unsuccessful and on 19 August the coiled tubing was cut at 2,200mMDRT1
leaving approximately 500 metres of coiled tubing in the bottom of the test string. The coiled tubing above 2,200 mMDRT has been subsequently removed from the hole and the current activity
is removing the test string from the hole.
2200 plus 500 equals 2700. ie the CT is NOT stuck in the horizontal
The 500m length still stuck runs from 2200 to 2700m
diagram of HW3 wellbore schematic at bottom of last 3 announcments show depth of various components in wellbore
uncased and horizontal sections start from closer to 3000m
- Forums
- ASX - By Stock
- COE
- Ann: Hammamet West-3 Production Test Update 2 - 2
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add COE (ASX) to my watchlist
(20min delay)
|
|||||
Last
19.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $501.6M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 68694 | 18.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
19.0¢ | 651003 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 68694 | 0.185 |
7 | 646214 | 0.180 |
5 | 541774 | 0.175 |
7 | 626908 | 0.170 |
5 | 426133 | 0.165 |
Price($) | Vol. | No. |
---|---|---|
0.190 | 651003 | 10 |
0.195 | 588217 | 6 |
0.200 | 804731 | 11 |
0.205 | 397895 | 8 |
0.210 | 160678 | 3 |
Last trade - 09.20am 18/09/2024 (20 minute delay) ? |
Featured News
COE (ASX) Chart |
Day chart unavailable