re: Ann: COE: Hammamet West-3 Production Test... Operations to...

  1. 35 Posts.
    re: Ann: COE: Hammamet West-3 Production Test... Operations to free the obstruction were unsuccessful and on 19 August the coiled tubing was cut at 2,200mMDRT1
    leaving approximately 500 metres of coiled tubing in the bottom of the test string. The coiled tubing above 2,200 mMDRT has been subsequently removed from the hole and the current activity
    is removing the test string from the hole.

    2200 plus 500 equals 2700. ie the CT is NOT stuck in the horizontal
    The 500m length still stuck runs from 2200 to 2700m

    diagram of HW3 wellbore schematic at bottom of last 3 announcments show depth of various components in wellbore

    uncased and horizontal sections start from closer to 3000m




 
watchlist Created with Sketch. Add COE (ASX) to my watchlist
(20min delay)
Last
22.5¢
Change
0.000(0.00%)
Mkt cap ! $594.0M
Open High Low Value Volume
22.5¢ 22.5¢ 22.0¢ $593.7K 2.672M

Buyers (Bids)

No. Vol. Price($)
10 290435 21.5¢
 

Sellers (Offers)

Price($) Vol. No.
22.5¢ 205975 5
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
COE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.