    The December ANN said "the CDP will use the planned shutdown over Christmas/New Year to cool the reactor and allow the first solids charge to be installed in the vessel."

    This is enough to say batch operations to me. A fixed amount of catalyst might have been added via the catalyst feed injector, but while the reactor was cold.

    The video from 2018 you mentioned I think most likely shows graphite from a storage hopper being emptied into a container, not directly out of the reactor.

    If you recall the August 2023 webinar, Mark Edwards indicated there are several hoppers installed at the CDP.

 
watchlist Created with Sketch. Add HZR (ASX) to my watchlist
(20min delay)
Last
47.5¢
Change
-0.005(1.04%)
Mkt cap ! $110.4M
Open High Low Value Volume
48.0¢ 49.0¢ 47.5¢ $61.12K 127.4K

Buyers (Bids)

No. Vol. Price($)
4 65343 47.5¢
 

Sellers (Offers)

Price($) Vol. No.
48.0¢ 4707 4
View Market Depth
Last trade - 12.34pm 27/05/2024 (20 minute delay) ?
Last
48.0¢
  Change
-0.005 ( 1.03 %)
Open High Low Volume
48.5¢ 49.0¢ 47.5¢ 63704
Last updated 12.08pm 27/05/2024 ?
HZR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.