Well for me personally there has been a decent risk reduction with the plant now having produced. The hurdle now isnt install, design, money...its now runnig this unit continuously of which 90% of it has been already. The handling of continuous graphite production appears to me to be the trick and im looking forward now to a gradual appreciation of the SP over the next 6 months.
Apart from potential failure of the tech at the CDP or damages to equipment etc, I can now see a steady flow of pregressive exciting and positive updates for us as we transition into smoother operations, demonstration to our potential customersand clients, and some vigorous advances in the proposed Hazer plants. First cab off the rank - Canada H2 plant investment decision, followed by some large graphite sample testing, and advancements in either the Engie or Chubu projects.
Happy for anymore left of field project announcements with any municipal sewerage operators or large natural gas producers/refiners.
- Forums
- ASX - By Stock
- HZR
- Ann: Hazer Achieves First Hydrogen and Graphite at CDP
Ann: Hazer Achieves First Hydrogen and Graphite at CDP, page-85
-
- There are more pages in this discussion • 200 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HZR (ASX) to my watchlist
(20min delay)
|
|||||
Last
29.5¢ |
Change
0.005(1.72%) |
Mkt cap ! $67.88M |
Open | High | Low | Value | Volume |
29.5¢ | 30.0¢ | 29.0¢ | $31.71K | 108.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 31978 | 29.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
29.5¢ | 17417 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 31978 | 0.290 |
4 | 18750 | 0.285 |
6 | 71082 | 0.280 |
6 | 25092 | 0.275 |
5 | 27376 | 0.270 |
Price($) | Vol. | No. |
---|---|---|
0.295 | 17417 | 2 |
0.300 | 79726 | 6 |
0.305 | 16393 | 1 |
0.310 | 17500 | 3 |
0.315 | 96527 | 2 |
Last trade - 16.10pm 17/09/2024 (20 minute delay) ? |
Featured News
HZR (ASX) Chart |