HZR 2.21% 33.3¢ hazer group limited

Ann: Hazer Selects Engineering Partner for Commercial Demo Plant, page-2

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 1,838 Posts.
    lightbulb Created with Sketch. 927
    HAZER SELECTS ENGINEERING PARTNER FOR
    COMMERCIAL DEMONSTRATION PLANT
    • Primero Group Ltd selected as preferred engineering contractor for Hazer Commercial
    Demonstration Plant.
    • Initial design engineering contract awarded to Primero under an Early Contractor
    Involvement (ECI) scope of work.
    PERTH, AUSTRALIA; 23 JULY 2019: Hazer Group Limited (ASX HZR) is pleased to announce the
    selection of Primero Group Ltd (ASX PGX) (“Primero” as the preferred engineering contractor for the
    proposed Hazer Commercial Demonstration Plant (“Hazer CDP”.
    Hazer has awarded Primero a contract for an Early Contractor Involvement (ECI) phase scope for work.
    Under this agreement, Primero will undertake initial detailed design activities necessary to allow project to
    progress to full EPC contracting and procurement. This contract will commence in late July and is expected
    to take approximately 4 months.
    Primero Group Ltd are a WA based independent engineering and construction company. Primero offers an
    integrated design, fabrication and construction service with engineering offices in Perth area and fabrication
    facilities in Bibra Lake (Perth, WA). Primero have a strong track record of delivering complex, small scale
    projects for leading power, energy and infrastructure clients.
    “We are delighted to move forward into the engineering phase of the Hazer CDP with Primero. We believe
    Primero are an excellent fit for the capabilities we need to deliver the CDP. I thank Primero for providing
    Hazer with a flexible, collaborative proposal to deliver this exciting project. I look forward to the Hazer and
    Primero teams working closely together to deliver a successful project.” said Hazer CEO Geoff Ward.
    The ECI Phase is expected to be completed around November 2019 and will provide Hazer the opportunity
    to continue into award of an Engineering Procurement Construction (EPC) contract. Completion of
    construction and commencement of commissioning for the Hazer CDP remains targeted for end 2020 as
    previously advised.
 
watchlist Created with Sketch. Add HZR (ASX) to my watchlist
(20min delay)
Last
33.3¢
Change
-0.008(2.21%)
Mkt cap ! $76.51M
Open High Low Value Volume
35.5¢ 35.5¢ 32.0¢ $77.82K 231.1K

Buyers (Bids)

No. Vol. Price($)
3 17228 32.5¢
 

Sellers (Offers)

Price($) Vol. No.
34.5¢ 20717 1
View Market Depth
Last trade - 15.52pm 04/10/2024 (20 minute delay) ?
HZR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.