re: Ann: Heap Leach Potential at Murchison Pr... A little difficult to put a value on the heap leach yet with more work to be done in the study but good to see they are targeting $500-550 cash costs.
I was allowing $600 but thought it might come in lower.
It is lower despite recoveries on average probably being a little below the 70% I was hoping for.
I think the sp may have reacted well today possibly because the market was placing very little value on the heap leach until seeing some significant results.
I think much more value will be added through the doubling of capacity of stage 3 and potentially high grade ore from Gab (stage 4).
I changed my sentiment from LT buy to buy when it dropped to 60c.
Looks like the market did the same.
- Forums
- ASX - By Stock
- KGL
- Ann: Heap Leach Potential at Murchison Project
Ann: Heap Leach Potential at Murchison Project , page-5
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KGL (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $63.51M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 283407 | 9.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.7¢ | 39191 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 283407 | 0.095 |
1 | 14884 | 0.093 |
1 | 5450 | 0.092 |
2 | 61000 | 0.091 |
1 | 100000 | 0.090 |
Price($) | Vol. | No. |
---|---|---|
0.097 | 39191 | 1 |
0.098 | 185577 | 1 |
0.100 | 47902 | 2 |
0.105 | 2800 | 1 |
0.110 | 40854 | 2 |
Last trade - 07.00am 05/09/2024 (20 minute delay) ? |
Featured News
KGL (ASX) Chart |
Day chart unavailable