Ann: Heintschel Field Primed for Development , page-16

  1. 90 Posts.
    tcisboss
    Thanks for that, i have an reasonable understanding of how production wells operate, what i was saying is if the water cut is too high perhaps the facility can't handle it and the production rates will be reduced, this will have an impact on the total output of the well, Perhaps the frac job has damaged the cement behind the casing allowing water to enter from cased zones, who knows? Al i know is i sold out because i wasn't happy with the results, this does not mean it is right or wrong just my opinion, good luck to those still holding.
 
watchlist Created with Sketch. Add BUR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.