The DFS discussed the mine strip ratios, and that mine waste would increase in Year 9 to maintain concentrate production (p17).
An upgrade to the MRE that will result from from the Helikon 4 drill campaign will likely push out the projected mine waste increase by 4 or 5 years. This will have a significant impact on the estimated operating costs for the project life, further improving the business case.
Profits made at Karibib must be shared with the 20% co-owner. If the costs are lower, but the margin remains unchanged, then a higher proportion of the total margin (Karibib + KIZAD) will flow to LPD.
- Forums
- ASX - By Stock
- LPD
- Ann: Helikon 4 shaping up to materially extend Phase 1 life
Ann: Helikon 4 shaping up to materially extend Phase 1 life, page-65
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LPD (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $17.17M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $73 | 36.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
22 | 20533755 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 56344744 | 59 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
22 | 20533755 | 0.002 |
118 | 274727803 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 51966953 | 53 |
0.004 | 28284816 | 35 |
0.005 | 9140858 | 12 |
0.006 | 7564226 | 13 |
0.007 | 2259531 | 4 |
Last trade - 10.04am 30/08/2024 (20 minute delay) ? |
Featured News
LPD (ASX) Chart |
The Watchlist
1CG
ONE CLICK GROUP LIMITED
Mark Waller, MD
Mark Waller
MD
Previous Video
Next Video
SPONSORED BY The Market Online