MEO meo australia limited

The well would not have collapsed. The silty section of the...

  1. 2,041 Posts.
    The well would not have collapsed. The silty section of the shale is plastic, think of the temperature at 200oC!

    It is hard to keep the 130m silt/shale section open and to case with a 7" liner.

    The top reservoir is already behind the 7" casing, and the bottom reservoir will hopefully be behind 4 1/2" liner. The reason for slotted liner would be b/c they cannot get the perf guns down that narrow diameter. In terms of outcomes, they can still test the gas composition, pressure, flow, and liquids content from the narrow diameter, so all good.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.