Here is the expected timeline for 88E’s drilling:
88E will be running logging while drilling, which involves gathering down hole data while drilling continues — so we should expect some updates on prospectivity across the six targeted reservoirs during drilling.
- Drilling started today - 10th March 2023. ✅
- Drilling to 3,500 feet - two weeks.
- Drilling to total depth of up to 12,500 feet - two more weeks to drill through all six reservoir targets.
- Wireline logging to target depth - straight after drilling is complete.
The wireline logging data will be used to plan for the flow test later this year / early 2024.
So until then lads, all that I can suggest is to....................
Great fortune one and all.
- Forums
- ASX - By Stock
- 88E
- Ann: Hickory-1 Well Spudded
Ann: Hickory-1 Well Spudded, page-81
-
-
- There are more pages in this discussion • 127 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 88E (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $57.86M |
Open | High | Low | Value | Volume |
0.2¢ | 0.3¢ | 0.2¢ | $2.595K | 1.271M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
85 | 90974037 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 568094960 | 235 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
84 | 90924037 | 0.002 |
505 | 1281414325 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 547924960 | 233 |
0.004 | 197608139 | 118 |
0.005 | 111628391 | 48 |
0.006 | 36391234 | 35 |
0.007 | 39505108 | 24 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
88E (ASX) Chart |