If a second mining operation does take place it should be an underground operation. This would mean getting all of the deposit with minimal or no dilution of the ore. The stated dimensions 80m long, 8m wide 6m high leave me scratching my head, that is a monster tunnel for a small easily accessible resource. Also in the report there is no estimation of potential tonnages. Still it is good news.
Add to My Watchlist
What is My Watchlist?