A great interview with Steve Parsons.
The great news from Steve was that he is working towards production and in his view with low power costs (6c/kwh - hydro generated) versus about 20c/kwh in Australia it underpins a overall loow cost operation at Green Bay.
Parsons also said that the existing mine infrastructure is very valuable with a 5m x 5m decline which allows large trucks to use and the 600m shaft at 6m x 3m allows for a lot of material to to hauled to surface.
Parsons is following the Belleview Gold Project development plan playbook and look at how successful that was.
Congrats to Steve Parsons and his entire team and I am very happy to be on board.
- Forums
- ASX - By Stock
- Ann: High-grade continuous mineralisation 460m outside resource
A great interview with Steve Parsons. The great news from Steve...
Featured News
Add FFM (ASX) to my watchlist
(20min delay)
|
|||||
Last
74.5¢ |
Change
-0.050(6.29%) |
Mkt cap ! $358.1M |
Open | High | Low | Value | Volume |
78.5¢ | 78.5¢ | 74.0¢ | $2.478M | 3.300M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 44754 | 74.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
74.5¢ | 6851 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 44754 | 0.740 |
1 | 11937 | 0.735 |
2 | 45937 | 0.730 |
8 | 68337 | 0.725 |
1 | 16000 | 0.720 |
Price($) | Vol. | No. |
---|---|---|
0.745 | 6851 | 1 |
0.760 | 1455 | 1 |
0.795 | 150789 | 2 |
0.815 | 100000 | 1 |
0.820 | 26714 | 3 |
Last trade - 16.10pm 05/08/2024 (20 minute delay) ? |
Featured News
FFM (ASX) Chart |