OK, while those deep drilling samples look very good, I have the following queries;
- It looks as though not all drilling was completed that had been planned to be completed by this stage. With the on-set of poor drilling conditions, does this now mean that the drilling program is behind? If so, does this effect the date at which the DFS will be completed? I would assume it would have to. Also, how long does drilling have to stop for due to poor conditions?
- Those new drilling results released look to allude to possible under-ground operations. How do these results interact (if at all) with the exploration targets the company was trying to hit so that the 3mtp/a, 10 year mine scenario could be considered? I was under the impression that underground mining would be looked at after the topside mining was completed. What I guess I'm getting at is, are we still looking good for a resource upgrade that will allow for the 3mtp/a, 10 year mine life?
- Forums
- ASX - By Stock
- STM
- Ann: High Grade Copper From Deep Drilling
Ann: High Grade Copper From Deep Drilling , page-2
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STM (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.6¢ |
Change
-0.001(14.3%) |
Mkt cap ! $30.73M |
Open | High | Low | Value | Volume |
0.7¢ | 0.7¢ | 0.6¢ | $39.72K | 5.752M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
17 | 13594914 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.7¢ | 21747429 | 12 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
17 | 13594914 | 0.006 |
40 | 34498954 | 0.005 |
41 | 21112890 | 0.004 |
15 | 12935640 | 0.003 |
6 | 8802499 | 0.002 |
Price($) | Vol. | No. |
---|---|---|
0.007 | 20961265 | 11 |
0.008 | 11255544 | 12 |
0.009 | 6294200 | 6 |
0.010 | 6200099 | 6 |
0.011 | 4515322 | 6 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
STM (ASX) Chart |