Interesting set of sums ,
Open cut Mining cost is normally on a BCM basis it use to be around $5 a (Bulk Cubic meter) BCM down to around 50 meters a couple of years ago but maybe it is a lot higher now like you seem to indicate
for the ore tonnage I was guessing 90 depth * 70 strike * 5 M thickness (including halo) = cc 31K BCM*
(then you would multiply by say 2.6 to get tonnage of ore for processing )
I got a lower strip ratio 200 meter pit length * 90 meter depth * 100 meter wide /2 = 900k BCM pit 900/31* = 29:1 strip
- Forums
- ASX - By Stock
- OAU
- Ann: High Grade Gold Intercept From Drill Core - Crown Prince
Ann: High Grade Gold Intercept From Drill Core - Crown Prince, page-13
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OAU (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
-0.001(5.56%) |
Mkt cap ! $57.14M |
Open | High | Low | Value | Volume |
0.9¢ | 0.9¢ | 0.8¢ | $15.34K | 1.780M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
10 | 10775943 | 0.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.9¢ | 11468037 | 15 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
10 | 10775943 | 0.008 |
12 | 26073326 | 0.007 |
12 | 56599998 | 0.006 |
17 | 17468058 | 0.005 |
9 | 7330397 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.009 | 11468037 | 15 |
0.010 | 15262617 | 16 |
0.011 | 4573864 | 10 |
0.012 | 2921367 | 6 |
0.014 | 1595 | 1 |
Last trade - 14.26pm 27/09/2024 (20 minute delay) ? |
Featured News
OAU (ASX) Chart |