Here's something to ponder:
As per the PSL website, “the mining operations at Lloyds Mine and its surroundings have led to the creation of dumps holding 4,660 tonnes of copper metal within a total material volume of 370,000 tonnes.”
At the present copper price, this translates to an approximate value of nearly $55 million AUD. Even if the company were to sell them at half price, it would still represent a substantial value of $27.5 million AUD, which is almost two times its current market capitalization. It's essential to note that this pertains solely to the copper portion, not even considering the gold content.
Ref:
https://patersonresources.com.au/projects/burraga-project/
- Forums
- ASX - By Stock
- PSL
- Ann: High Grade Gold intercepts next to Telfer continue
Ann: High Grade Gold intercepts next to Telfer continue, page-25
-
-
- There are more pages in this discussion • 53 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PSL (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.016M |
Open | High | Low | Value | Volume |
1.1¢ | 1.1¢ | 1.1¢ | $4.393K | 399.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 460900 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 19987 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 460900 | 0.010 |
2 | 575000 | 0.009 |
1 | 120000 | 0.008 |
2 | 628710 | 0.007 |
3 | 1375000 | 0.006 |
Price($) | Vol. | No. |
---|---|---|
0.011 | 19987 | 1 |
0.012 | 130001 | 3 |
0.013 | 207189 | 2 |
0.014 | 16949 | 1 |
0.015 | 520512 | 3 |
Last trade - 15.11pm 26/06/2024 (20 minute delay) ? |
Featured News
PSL (ASX) Chart |