FFM 4.35% 84.0¢ firefly metals ltd

830k is the project size that means this is the estimated amount...

  1. AJ7
    15,710 Posts.
    lightbulb Created with Sketch. 1145
    830k is the project size that means this is the estimated amount of gold prospect & 11.6 g/t means 11.6 grams per tonne gold mine. With a roughly ASIC of 300$ Under current Gold spot sitting at 1775$, the asset is 1.2b $ and AUT is sitting at 200 m MC...expect a take over bid soon!
 
watchlist Created with Sketch. Add FFM (ASX) to my watchlist
(20min delay)
Last
84.0¢
Change
0.035(4.35%)
Mkt cap ! $403.7M
Open High Low Value Volume
80.0¢ 86.0¢ 80.0¢ $2.334M 2.797M

Buyers (Bids)

No. Vol. Price($)
2 15472 83.5¢
 

Sellers (Offers)

Price($) Vol. No.
85.0¢ 12690 4
View Market Depth
Last trade - 16.10pm 24/07/2024 (20 minute delay) ?
FFM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.