@hurtadarryl again the system won't allow me to reply to your post
"The absolute value of mining was $5.19/t. The absolute value of processing was $19.3/t."
I agree with those figures based on the Activities report quoted Mining cost $4.1m, processing cost $16.3m for 798kt mined.
My point is (extreme example) The 326kt of tailings (out of the 798kt total) may only have cost $100k to mine & $100k to process with the remainder of processing + mining costs allocated to Viper/Pit5
In the above hypothetical example, the tailings would have been incredibly profitable.
At the other end of the range, the bulk of the $4.1m & $16.3m costs could have been for the tailings.
Obviously they are 2 extreme examples & the actual cost is somewhere in between.
We just have no way of knowing how much of the $4.1m mining cost, or $16.3m Processing cost is allocated to the Tailings. All we know is that it will be significantly cheaper than the mining/processing of Viper/Pit5 ore.
- Forums
- ASX - By Stock
- FFX
- Ann: High Grade Gold Results from the Morila Super Pit
Ann: High Grade Gold Results from the Morila Super Pit, page-58
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FFX (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham / Dr Alan Dunton, MD & CEO / Non-Executive Director
James Graham / Dr Alan Dunton
MD & CEO / Non-Executive Director
SPONSORED BY The Market Online