WTM 9.09% 12.0¢ waratah minerals limited

Even Cherie has no idea how much the cost could be to drill that...

  1. 4,793 Posts.
    lightbulb Created with Sketch. 90
    Even Cherie has no idea how much the cost could be to drill that western target yet and it is should be planed by Geo first...

    As for monte,The primary target is for northen bufflo high grade zone with Jorc drilling....

    Mta is also put balama central as a priority one due to the same strike from SFR....

    So be conservative, with current 3 million funds plus Michael equity drilling contract, Mta is quite capable of planing drilling for Monte Jorc bufflo project, Balama central projects, plus **on zinc project..

    And these will create enough catalysts to get SP a lot higher than current price and it would be smarter to raise then, not now, and look Cherie did before, get sp trading higher enough and raise higher to get less dilution.....

    So please stop talking CR to down Mta....

    Any meaningful and reasonable posts welcome, but not the CR garbage as being used 1000 times in HC.....

    mta is very likely above 10c before Balama central drilling start..... with the big suprise from Monte, be honestly, 149 meters with 9% TGC, no wonder the market got crazy before open....

    The sell down might come from those trapped due to that Rio Ann, but the situation where Mta is now is improved a lot since that big drop.....

    It will trade back up above 10c soon....

    We wait and see
 
watchlist Created with Sketch. Add WTM (ASX) to my watchlist
(20min delay)
Last
12.0¢
Change
0.010(9.09%)
Mkt cap ! $21.52M
Open High Low Value Volume
11.5¢ 12.5¢ 11.5¢ $44.39K 372.3K

Buyers (Bids)

No. Vol. Price($)
2 54804 12.0¢
 

Sellers (Offers)

Price($) Vol. No.
12.5¢ 140700 2
View Market Depth
Last trade - 15.50pm 28/06/2024 (20 minute delay) ?
WTM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.