I agree another cr cannot be far away. The milling timeline for Burbanks Nth is a guide only, being oxide ore the milling through put could be higher. Also if Burbanks Nth was milled at another plant I assume GSR would need to revisit mining/milling costs.
We should see the SS within the next three weeks, I hope the numbers are good, but I doubt it.AIMO.
GSR Price at posting:
0.7¢ Sentiment: None Disclosure: Held