I agree another cr cannot be far away. The milling timeline for Burbanks Nth is a guide only, being oxide ore the milling through put could be higher. Also if Burbanks Nth was milled at another plant I assume GSR would need to revisit mining/milling costs.
We should see the SS within the next three weeks, I hope the numbers are good, but I doubt it.AIMO.
- Forums
- ASX - By Stock
- GSR
- Ann: High-Grade Intercepts Extends Potential at Burbanks
Ann: High-Grade Intercepts Extends Potential at Burbanks, page-40
- There are more pages in this discussion • 46 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GSR (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $15.10M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
GSR (ASX) Chart |
Day chart unavailable