• AVZ’s camp has been completed, permitting increased support of its exploration activities. The camp includes a large core-yard, workshops, storage facilities, accommodation, offices and a dedicated kitchen with attached dining room. This extensive camp is necessary to support the scale of activities being undertaken by AVZ and its completion was achieved largely through local Congolese workers residing in Manono.
• The required site-visit by the consultants that will prepare the Resource Estimate has been completed.
• Additional data required to support the preparation of a Resource Estimate, such as topographic surveys, bulk density determinations and additional characterisation investigations are in-progress.
• Preliminary metallurgical testing of material from drill holes MO17DD001 and MO17DD002 is in-progress.
I believe the workers camp point should be noted. It doesn't appear that this camp is going to be disbanded once the drilling finishes. Looks like it's being set up for an extensive period of time.
Haplo
AVZ Price at posting:
21.5¢ Sentiment: Buy Disclosure: Held