Some of the PMT elements re concentrators I've put in the separate thread.
Another reference point for UG costs being ~A$70-75/t comes from PMT's UG estimate of C$68.7/t. If the is the rate of UG mined ore then the deeper extensions of Burmeister are most likely going to be more profitably mined using UG mining than a deep open pit. I suspect a modest thickness, gently sloping seam is highly amenable to UG mining because the mining with would greatly exceed the true width. A true width 20m seam may start to act like a 50m-100m wide seam when horizontal slices are considered.
If the UG ore is 1.4% with 70% recovery rates then 5.6t of ore is needed for one ton of SC5.5. If Burmeister were to have UG mining costs of US$52.2/t then the mining cost for spod would be ~US$293/t. Mining costs are frequently the highest cost item in the cost structure for hard rock mines.
- Forums
- ASX - By Stock
- Ann: High Grade Lithium at Jaegermeister
Some of the PMT elements re concentrators I've put in the...
Featured News
Add TG6 (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.0¢ |
Change
0.010(7.69%) |
Mkt cap ! $9.955M |
Open | High | Low | Value | Volume |
13.5¢ | 14.0¢ | 13.5¢ | $9.9K | 73.01K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 110000 | 13.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
14.0¢ | 92209 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 110000 | 0.135 |
1 | 40000 | 0.130 |
4 | 56197 | 0.125 |
3 | 61499 | 0.120 |
2 | 53985 | 0.115 |
Price($) | Vol. | No. |
---|---|---|
0.140 | 92209 | 2 |
0.150 | 59867 | 3 |
0.160 | 121487 | 3 |
0.175 | 25152 | 1 |
0.180 | 15000 | 2 |
Last trade - 16.10pm 30/09/2024 (20 minute delay) ? |
Featured News
TG6 (ASX) Chart |