Some very quick and dirty calculations (non-selective and assuming a 50x50m grid), with an SG of 1.4 gave me:
2.75Mt at 2.45% REO and 0.54%NdPr, which will provide roughly another 2-3 years production.
The area to the South South West of LRC011, 203, 204 looks to be especially sweet. Also that previously undrilled block to the NW of the pit now contains some reasonable good grades.
A nice set of Results, fully in line with expectations,
Ann: High grade NdPr drill results expected to upgrade resource, page-5
Add to My Watchlist
What is My Watchlist?