ENR 13.0% 53.5¢ encounter resources limited

Update of drilling at Crean to 7/7.A fourth line (200m west -...

  1. 3,059 Posts.
    lightbulb Created with Sketch. 8251
    Update of drilling at Crean to 7/7.

    https://hotcopper.com.au/data/attachments/6295/6295430-8231e77074c04a0b2004a8b15569f3c9.jpg
    A fourth line (200m west - yellow) has been set up and possibly drilled on 40m centers. Previous line shown without drill sites has been drilled (spots anyway).

    Stars are likely to be sites drilled by another rig. RC or DD. Perhaps AC returned. Something anyway.

    Still of the Sentinel view of area on 7/7

    https://hotcopper.com.au/data/attachments/6295/6295440-0db7224533f9e7d61d102b321b04a3e8.jpg

    Time lapses

    https://hotcopper.com.au/data/attachments/6295/6295441-94e7325f20e817ba4a9e22eb663916c2.jpg

    extended area.

    https://hotcopper.com.au/data/attachments/6295/6295444-d96a86ca5307bccc9a035d17bc38898f.jpg
    ====
    An extension fence 200m west of the previous 150m step out. Maybe the dyke continues west at wider than expected dimensions????

    Not unexpected to test the better zones with RC. Some depth test possibly indicated by early AC. But is such necessary at this time? RC drilling to confirm AC and possibly be used for any later resource calculations.

    INTERPRETATIONS DYOR.

    Haven't checked elsewhere in detail. Nothing noted at Joyce.

 
watchlist Created with Sketch. Add ENR (ASX) to my watchlist
(20min delay)
Last
53.5¢
Change
-0.080(13.0%)
Mkt cap ! $243.4M
Open High Low Value Volume
61.0¢ 61.0¢ 51.0¢ $1.065M 1.945M

Buyers (Bids)

No. Vol. Price($)
2 6448 53.0¢
 

Sellers (Offers)

Price($) Vol. No.
54.0¢ 4566 2
View Market Depth
Last trade - 13.51pm 31/07/2024 (20 minute delay) ?
ENR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.