-
Share
4,469 Posts.
855
05/09/18
10:56
Share
The decision to raise money was made months ago
Well before the site tour and well before reaching the intermediate zone
It’s set up to be drawn in 3 tranches IF needed
Thinking way ahead
Very sensible
And still they get critisised
I think it’s accepted the gravity plant is not ideal but at these grades even 70% recovery will do for now
-