Yeah, that's correct @ad0. In regard to throughput rates, the Mar'21 quarterly included some detail about the capacity of the proposed upgraded plant (i.e. up to 35 tonnes per hour throughput) & the operating proposal for an initial 12 hr/day shift. The Scoping Study (Part 1) mentioned that the start-up production is assumed to be 120,000 tonnes per annum & then moving to a throughput of 240,000 tonnes per annum in year (3).
Any changes to the existing plant configuration / mining operations requires variations to existing approvals associated with a revised MOP (Mining Operations Plan). A good example of this is one of the EPA license variation notices (refer below link) for the previous Adelong mine owner. In the below link you can download a Pdf of the variation notice by clicking on 'View Report' under the heading 'Summary of Notice No: 1530403'...
https://apps.epa.nsw.gov.au/prpoeoapp/Detail.aspx?instid=10265&id=1530403&option=notice&range=POEO%20licence¬icetype=
- Forums
- ASX - By Stock
- Ann: High Grade Results at Caledonian Deposit
Yeah, that's correct @ad0. In regard to throughput rates, the...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADG (ASX) to my watchlist
|
|||||
Last
0.6¢ |
Change
-0.001(14.3%) |
Mkt cap ! $6.708M |
Open | High | Low | Value | Volume |
0.7¢ | 0.7¢ | 0.6¢ | $9.424K | 1.349M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
16 | 13655192 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.7¢ | 1732673 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
16 | 13655192 | 0.006 |
23 | 6468776 | 0.005 |
19 | 28370587 | 0.004 |
38 | 37531383 | 0.003 |
8 | 48500000 | 0.002 |
Price($) | Vol. | No. |
---|---|---|
0.007 | 1732673 | 2 |
0.008 | 4908236 | 14 |
0.009 | 5742999 | 10 |
0.010 | 10805519 | 12 |
0.011 | 3131733 | 6 |
Last trade - 16.10pm 25/06/2024 (20 minute delay) ? |
Featured News
ADG (ASX) Chart |