DTM 10.0% 1.8¢ dart mining nl

At current gold prices (about A$2,500 per ounce at the time of...

  1. 36 Posts.
    lightbulb Created with Sketch. 2
    At current gold prices (about A$2,500 per ounce at the time of writing) grades of 1g/t make an open cut project viable, while anything over 5g/t is considered high grade. Depending on the scale of underground mines, 4g/t can be viable.

    (Source unauthorised investment advice)

    There are some "High Grade" results in the drill cores, but only a few Centimetres.

    Don't be fooled by the presence of "Pyrite".
 
watchlist Created with Sketch. Add DTM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.