BML 4.00% 12.0¢ boab metals limited

Page 2 Quarterly Activities 31/7/19. “The PFS estimated a CAPEX...

  1. 2,323 Posts.
    lightbulb Created with Sketch. 91
    Page 2 Quarterly Activities 31/7/19.
    “The PFS estimated a CAPEX of A$95.4M to develop the mine, with a 16-month payback and a pre-tax NPV8 of
    A$243M1 (See ASX Announcement 26 March 2019)”.
    Drill results due this week and a revised PFS due during September.
    When Zinc gets factored in and the latest drill results hopefully showing plenty of Silver get worked in, I feel the
    already amazing 16 month payback will be significantly less.
    When the Qtrly Activ report was issued 31/7/19, Silver price was $24.19 Aus.
    4 weeks later, our project is much more attractive with Silver at $26.76 Aus.
 
watchlist Created with Sketch. Add BML (ASX) to my watchlist
(20min delay)
Last
12.0¢
Change
-0.005(4.00%)
Mkt cap ! $22.01M
Open High Low Value Volume
12.5¢ 13.0¢ 12.0¢ $38.79K 316.0K

Buyers (Bids)

No. Vol. Price($)
7 234402 12.0¢
 

Sellers (Offers)

Price($) Vol. No.
14.0¢ 14285 1
View Market Depth
Last trade - 16.10pm 26/04/2024 (20 minute delay) ?
Last
12.3¢
  Change
-0.005 ( 2.00 %)
Open High Low Volume
12.5¢ 13.0¢ 12.0¢ 280249
Last updated 15.48pm 26/04/2024 ?
BML (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.