actually, got the calc wrong
median target is another 40 year mine life at 2Mtpa
top target is another 50 year mine life at 2Mtpa
(470M x 55% grade x 40% recovery / 2mtpa = 52 year mine life)
Ann: High Grade Sylvinite Hangingwall Seam at Yangala Prospect, page-4
Add to My Watchlist
What is My Watchlist?