long road ahead, however
the Kola (indicated/measured) JORC for the PFS required 30 to 40 drill holes
the Yangala drilling has 2 holes so far and another 4-5 drillholes is planned to commence late Q2 2015 and take 4 months to complete. Holes will be between 450 and 600 metres depth. Phase 2 may be implemented if Phase 1 gives positive results, comprising a larger programme (upwards of 10 drillholes) with the intention of delineating a resource of a size indicated by the Exploration Target.
based in the number of holes, the JORC is likely to be 'inferred'
long road ahead, however the Kola (indicated/measured) JORC for...
Add to My Watchlist
What is My Watchlist?