5.5 years based on a Restart Study that used historical info.
If they can get that to 10 years at 100% mill capacity this will 10 bag
- Forums
- ASX - By Stock
- RVR
- Ann: HIgh-grade Zinc Results at Thalanga Far West Infill Program
Ann: HIgh-grade Zinc Results at Thalanga Far West Infill Program, page-12
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)