Hi there OT, mate, there is a long time between now and a "starter mine".
First we need the Canadian Met tests results as well as the process flow model that Entech need so they can provide a mineral resource estimate.
Then they need to do the scoping study which I assume will include the mine design anddevelopment, the mining production schedules and the financial modelling.
Then they need approvals and so on. So we are a long way from turning Strickland ore into revenue.
And, as they foreshadowed in December, they might even bring Investigators and Cathedrals infill results into the MRE equation and if they do that, you would bet that the time frame would be pushed further out.
I wonder if that RC rig has arrived at MA to do the INV CATH infill?
There is a lot of information that we investors are hanging out for atm.
Cheers
Mulac1
- Forums
- ASX - By Stock
- Ann: High-Impact Drilling at Mt Alexander
Hi there OT, mate, there is a long time between now and a...
-
- There are more pages in this discussion • 58 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SGQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $33.74M |
Open | High | Low | Value | Volume |
3.1¢ | 3.1¢ | 3.1¢ | $45.78K | 1.476M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 3094416 | 3.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.1¢ | 507931 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 3094416 | 0.030 |
8 | 2900153 | 0.029 |
7 | 2331855 | 0.028 |
5 | 2940740 | 0.027 |
10 | 15905428 | 0.026 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 507931 | 1 |
0.032 | 398102 | 4 |
0.033 | 867656 | 7 |
0.034 | 449428 | 2 |
0.035 | 748105 | 6 |
Last trade - 15.55pm 18/09/2024 (20 minute delay) ? |
Featured News
SGQ (ASX) Chart |