WEL 20.0% 0.4¢ winchester energy ltd

Ann: High Margin Oil Production in a High Oil Price Environment, page-4

  1. 667 Posts.
    lightbulb Created with Sketch. 78
    Re the Varn project:

    Quote from Ann: "The up-front acquisition and development (ie drilling of 11 wells and all infrastructure
    required to produce) cost is US$5.61 per barrel. It is anticipated that this will be paid out of
    existing cashflow".

    Can anyone explain how the $5.61 is arrived at ??
    Is it based on expected BOE, which is 1,000,000 barrels?

    I wish the development cost expectations is shown as a figure.

    thanks
 
watchlist Created with Sketch. Add WEL (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
-0.001(20.0%)
Mkt cap ! $4.082M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $7.58K 1.894M

Buyers (Bids)

No. Vol. Price($)
3 5966666 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 1000000 1
View Market Depth
Last trade - 10.21am 27/06/2024 (20 minute delay) ?
WEL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.