GT1 green technology metals limited

And the best may be still to come. 31 Drills holes done, but the...

  1. 3,848 Posts.
    lightbulb Created with Sketch. 7746
    And the best may be still to come. 31 Drills holes done, but the later map in the announcement shows 39 planned drilling locations.

    Having got a strong result in RL22-041 of 19.0m, another three drill holes are planned to the left of this, along with four more to the left of RL-22-022 (14.3m) and RL-22-035 (12.7m). To the NE, #38 and #40 are the first of a string of 4 holes to see what this NE Peg extension does down-dip. a better idea of this the plan then seems to be extend along-strike where the first further step out hole has been planned.

    Not to be missed in the drill results is the announcement that the baseline study work has kicked off. GT1's seen enough already to know that they want these completed ASAP meaning starting them before a JORC resource has been announced.

    https://hotcopper.com.au/data/attachments/4855/4855777-9de2f570f8ef5c4c1e5770e310a65a6c.jpg
    https://hotcopper.com.au/data/attachments/4855/4855833-83fb33b6af7f8d579f80f29547eae839.jpg

 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
2.9¢
Change
0.000(0.00%)
Mkt cap ! $13.77M
Open High Low Value Volume
3.0¢ 3.0¢ 2.9¢ $3.156K 105.3K

Buyers (Bids)

No. Vol. Price($)
1 40226 2.9¢
 

Sellers (Offers)

Price($) Vol. No.
3.0¢ 137202 1
View Market Depth
Last trade - 11.03am 29/07/2025 (20 minute delay) ?
GT1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.