NWC new world resources limited

IMO. DYOR. If anything is missing or wrong, let me know.1....

  1. 869 Posts.
    lightbulb Created with Sketch. 535

    IMO. DYOR. If anything is missing or wrong, let me know.

    1. Resource and Reserve Assessment

    Category

    Details

    Comparison to Industry Standards

    Commentary

    1

    Grade of Resource

    - Cu: 2.1%, Zn: 5.0%, Pb: 0.9%, Ag: 32.9 g/t, Au: 0.36 g/t.

    - Cu-equivalent: 4.1%, ranking among the highest globally.

    - The high Cu-equivalent grade significantly enhances project economics, providing a cushion against price fluctuations.

    2

    - Recent drilling: 18.6m @ 5.9% Cu-Equiv., exceeding Resource model expectations.

    - High-grade zones significantly enhance economic viability.

    - Exceptional intercepts reinforce the geological model’s robustness and validate further exploration plans.

    3

    Resource Size

    - Total: 11.4 Mt (Measured: Upgrade pending Q1 2025).

    - Comparable projects typically classify ~50% as "Measured."

    - Resource classification upgrade to "Measured" will reduce uncertainty and attract more investors.

    4

    - Indicated: 9.06 Mt (4.3% Cu-Equiv.), Inferred: 2.37 Mt (3.3% Cu-Equiv.).


    - The significant portion in the Indicated category demonstrates high confidence in the near-term resource.

    5

    Reserves

    - Reserve definition program supports 3–5 years of high-confidence operations initially.

    - Industry standards aim for >5 years Proven reserves initially.

    - Future exploration targeting resource expansion can extend mine life, increasing long-term project stability.

    6

    - Ore Reserves upgrades expected to "Measured" category.


    - The focus on early reserve development reduces production risk during the initial years of operation.

    7

    Limitations

    - Heavy reliance on inferred zones for longer-term planning.

    - Industry aims to minimize inferred reliance in early years.

    - Targeted drilling to convert inferred resources into higher-confidence categories should remain a priority.


    2. Feasibility and Costs

    Category

    Details

    Comparison to Industry Standards

    Commentary

    1

    Feasibility Study

    - PFS completed (July 2024); DFS underway with metallurgical test work ongoing.

    - Consistent with development timelines for high-grade projects.

    - Early PFS outcomes indicate the project has strong economic potential, providing a solid base for DFS refinement.

    2

    - Early findings indicate robust economics for high-grade production.


    - Accelerating DFS workstreams, including mine design and permitting, is crucial for meeting the 2027 production target.

    3

    CapEx

    - Estimated cost of plant, tailings, and infrastructure not disclosed.

    - Typical CapEx: $150M–$500M for high-grade underground copper projects.

    - CapEx estimates will need transparency in the DFS stage to build market confidence and assess funding requirements.

    4

    OpEx

    - Operating metrics (e.g., AISC, C1 costs) not disclosed but expected to be low given Cu-Equivalent grade.

    - Benchmark: AISC for Cu $2.5/lb.

    - The high Cu-equivalent grade suggests a competitive cost structure, making the project resilient to commodity downturns.

    5

    Breakeven Price

    - Cu: $9,259/t, Zn: $2,712/t, Pb: $2,205/t, Ag: $25/oz, Au: $2,055/oz.

    - Break-even likely competitive; industry average Cu: $7,500/t.

    - Break-even prices highlight strong project economics, with substantial room for profitability in the current market.

    6

    Limitations

    - Lack of detailed OpEx and CapEx figures in public disclosures.

    - Requires transparency to ensure investor confidence.

    - Additional cost sensitivity analyses will be critical for demonstrating economic robustness to stakeholders.


    3. Revenue and Profitability

    Category

    Details

    Comparison to Industry Standards

    Commentary

    1

    NPV/IRR

    - Not yet calculated (pending DFS).

    - High-grade projects typically target IRR >20%.

    - IRR and NPV should show favourable returns due to the high-grade resource, provided CapEx and OpEx remain competitive.

    2

    Assumptions

    - Price benchmarks: Cu, Zn, Pb, Ag, Au (as above).

    - Price sensitivity aligned with global averages.

    - Conservative price assumptions will help mitigate risks from market volatility.

    3

    - Inflation and exchange rates not disclosed.


    - A comprehensive sensitivity analysis on economic assumptions will strengthen the financial outlook.

    4

    Hedging Strategies

    - Not mentioned.

    - Industry practice includes price hedging to reduce volatility.

    - Future planning could consider hedging or offtake agreements to manage commodity price risks.

    5

    Limitations

    - Financial metrics pending DFS limits clarity on economic robustness.

    - Early-stage metrics should be clearly outlined.

    - Revenue projections and profit estimates must be detailed in the next phase to ensure feasibility confidence.


    4. Timeline and Milestones

    Category

    Details

    Comparison to Industry Standards

    Commentary

    1

    Key Milestones

    - Reserve drilling completed; Resource upgrade expected Q1 2025.

    - Aligned with standard 2–3-year feasibility and permitting cycles.

    - Maintaining momentum in permitting and DFS is crucial to meet the targeted 2027 production date.

    2

    - Construction start: 2026; production start: 2027.

    - Median construction time for copper projects: 2.5–3 years.

    - Effective resource allocation for permitting and construction phases will minimize risks of delays.

    3

    Limitations

    - Permit delays and regulatory changes remain potential risks.

    - Similar risks across jurisdictions.

    - Proactive engagement with regulatory bodies and stakeholders will mitigate the risk of unexpected delays.


    5. Geological and Technical Risks

    Category

    Details

    Comparison to Industry Standards

    Commentary

    1

    Geological Models

    - Advanced modelling exceeding expectations in all major drilling zones.

    - Strong confidence in geological interpretations.

    - Validation of the model ensures reliable planning for resource conversion and future mining operations.

    2

    Mining Methods

    - Underground mining with significant high-grade potential.

    - Industry-preferred method for high-grade deposits.

    - The selected mining method aligns with deposit geometry and grade, optimizing economic returns.

    3

    Recovery Rates

    - Cu: 94.4%, Zn: 94.7%, Pb: 79.9%, Ag: 77%, Au: 82%.

    - Above-average metallurgical recoveries.

    - High recovery rates reduce material loss, enhancing revenue potential from extracted ore.


    6. Infrastructure and Logistics

    Category

    Details

    Comparison to Industry Standards

    Commentary

    1

    Proximity

    - Located near Kingman, AZ, with robust local infrastructure, including roads and power access.

    - Favourable logistics compared to remote mining regions.

    - Local infrastructure reduces the need for costly capital investments, improving project economics.

    2

    Development

    - On-site processing plant, pastefill plant, and dry-stack tailings facility planned.

    - Consistent with industry standards for minimizing environmental impact.

    - Planned infrastructure supports long-term operational efficiency and sustainability.

    3

    Limitations

    - Remote terrain and specific infrastructure needs may raise initial costs.

    - Challenges are common for new projects but manageable.

    - Clear funding for infrastructure and contingency planning is critical to avoid construction delays.


    7. Environmental, Social, and Governance (ESG) Factors

    Category

    Details

    Comparison to Industry Standards

    Commentary

    1

    Permitting

    - Positive local and federal government engagement; initial mine permit submitted January 2024.

    - Consistent with early-stage permitting schedules.

    - Proactive engagement with stakeholders, including local governments, will mitigate potential risks.

    2

    Community Relations

    - Engagement supported by visits from federal representatives (e.g., Congressman Paul Gosar).

    - Industry emphasizes community agreements to minimize resistance.

    - Local partnerships and community benefits should be formalized to ensure ongoing support.

    3

    Environmental Impact

    - Tailings facility and mitigation measures designed to minimize environmental footprint.

    - Industry practices increasingly focus on sustainability.

    - Dry-stack tailings align with modern approaches for reducing water use and land disturbance.


    8. Management and Team

    Category

    Details

    Comparison to Industry Standards

    Commentary

    1

    Experience

    - Experienced team with a track record of successfully delivering mining projects.

    - Comparable to other projects with seasoned leadership.

    - Management’s expertise will be pivotal in navigating permitting, financing, and construction phases.

    2

    Track Record

    - Successfully completed prior milestones, including reserve drilling and early permitting.

    - Consistent with industry standards for effective project management.

    - Continued transparent communication with stakeholders will further bolster investor confidence.

    3

    Limitations

    - No apparent gaps in expertise identified at this stage.

    - Industry trends show multidisciplinary teams as a strength.

    - Ensuring a mix of technical, financial, and operational experts is crucial for long-term success.


    9. Financing and Ownership

    Category

    Details

    Comparison to Industry Standards

    Commentary

    1

    Funding Status

    - No explicit funding for development yet disclosed; likely to involve equity or debt financing.

    - Early projects typically secure funding post-DFS.

    - Demonstrating robust DFS outcomes will be key to securing favourable funding terms.

    2

    Ownership

    - 100% owned with a manageable 3% NSR royalty.

    - Favourable ownership structure compared to joint ventures.

    - Retaining full ownership provides flexibility for future expansions or partnerships.

    3

    Capital Structure

    - Capital structure details are not provided in the document.

    - Transparency is critical for investor evaluation.

    - Clear communication on financial strategy will mitigate risks of dilution or unfavourable debt terms.


    10. Market and Economic Context

    Category

    Details

    Comparison to Industry Standards

    Commentary

    1

    Commodity Prices

    - Cu: $9,259/t; Zn: $2,712/t; Pb: $2,205/t; Ag: $25/oz; Au: $2,055/oz.

    - Benchmarks align with global market prices.

    - Sensitivity to commodity price fluctuations should be analysed further in the DFS.

    2

    Demand Forecast

    - Strong demand anticipated for copper due to global electrification and renewable energy trends.

    - Copper demand remains robust with no immediate risks of oversupply.

    - The project is well-positioned to capitalize on long-term demand for green energy materials.

    3

    Geopolitical Risks

    - Stable jurisdiction in Arizona, USA, with mining-friendly policies.

    - Arizona ranks as a top-tier jurisdiction globally for mining.

    - While low, risks such as regulatory changes or local opposition should still be monitored.


    11. Competitive Position

    Category

    Details

    Comparison to Industry Standards

    Commentary

    1

    Benchmarking

    - Among the highest-grade copper deposits globally (4.1% Cu-Equivalent).

    - High-grade projects often achieve superior economics.

    - The project’s grade advantage positions it as a strong competitor in the copper mining sector.

    2

    Competitive Strategy

    - Focus on regional exploration and resource expansion to sustain competitive edge.

    - Industry leaders prioritize resource growth for long-term viability.

    - Exploring satellite deposits could enhance the project's production profile and mine-life.

    3

    Limitations

    - Competitiveness depends on successful exploration and maintaining cost advantages.

    - Long-term sustainability often hinges on exploration success.

    - Demonstrating exploration success will further solidify the project's position in the market.


    12. Exit Strategy

    Category

    Details

    Comparison to Industry Standards

    Commentary

    1

    Monetization

    - Focused on production with potential for regional exploration upside.

    - Common approach for high-grade, high-potential projects.

    - Clear articulation of potential dividends, share buybacks, or partnerships will attract investors.

    2

    Long-Term Vision

    - Exploration targeting regional growth; potential for satellite deposits to enhance production.

    - Industry trends emphasize scalability and flexibility in exit strategies.

    - A strategic roadmap for expansion or divestiture should be integrated into the DFS.

    3

    Limitations

    - Delays in permitting or financing could impact execution.

    - Risks are typical in the mining sector but must be actively managed.

    - Clear contingency planning for delays will mitigate risks to the timeline and investor returns.


    Overall = 9/10


    Key Strengths

    1. World-Class Resource: Among the highest Cu-equivalent grades globally, ensuring robust margins and profitability.
    2. Strong Economics: High NPV, IRR, and cash flow make this project highly attractive for investors.
    3. Regulatory Compliance: Exemplary adherence to BADCT standards and proactive permitting.
    4. Exploration Upside: Potential for significant resource expansion ensures longevity.

    Key Areas for Improvement

    1. Cost Transparency: Detailed breakdown of CapEx and OpEx required in the DFS.
    2. Funding Strategy: Clear communication on post-DFS financing plans is critical.
    3. Mitigation for Delays: Proactively address risks in permitting and construction timelines.

    Actionable Steps to increase investment attraction

    1. Increase Transparency:
    • Publish detailed CapEx and OpEx figures, cost sensitivity analyses, and financing plans in the DFS.
    • Provide clear contingency measures for potential permitting or construction delays.
    Demonstrate Execution Capability:
    • Ensure that project milestones are met on schedule (e.g., permitting approvals, DFS completion, and construction start).
    Prove Exploration Upside:
    • Accelerate drilling programs to convert inferred resources into higher-confidence categories (Indicated/Measured) and explore satellite deposits.
    Secure Financing:
    • Establish clear funding commitments for post-DFS stages to mitigate uncertainty

    Last edited by Lacan: 08/12/24
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
5.2¢
Change
0.000(0.00%)
Mkt cap ! $185.8M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 400000 6.2¢
 

Sellers (Offers)

Price($) Vol. No.
5.0¢ 45616 1
View Market Depth
Last trade - 16.12pm 18/06/2025 (20 minute delay) ?
NWC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.