I found a link for Fracture Stimulating of well bores - sounds as though they are going to try and force it out with a higher flow, as per this comment: "The well is presently shut-in to acquire additional pressure data".
Still good news though with them proceeding with construction of production facilities.
Have a read anyways:
http://www.patentstorm.us/patents/7451820/description.html