IMO most of the volume has been coming within the top 5
Retail has probably been a thorn in their sides
Whatever they have been doing has not required holding notices even though one has vanished and one has appeared
Interesting to say the least, to me they have certainly used the "drilling delay" as a period needed to shuffle the deck.
Buckle up IMO we are heading towards a significant rerate
- Forums
- ASX - By Stock
- LRV
- Ann: Hillgrove Gold-Antimony Project Pre-Feasibility Study
Ann: Hillgrove Gold-Antimony Project Pre-Feasibility Study, page-354
-
-
- There are more pages in this discussion • 291 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LRV (ASX) to my watchlist
(20min delay)
|
|||||
Last
39.5¢ |
Change
0.020(5.33%) |
Mkt cap ! $122.4M |
Open | High | Low | Value | Volume |
37.0¢ | 42.0¢ | 37.0¢ | $995.9K | 2.492M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 56896 | 39.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
40.0¢ | 10000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 56896 | 0.395 |
4 | 45985 | 0.390 |
2 | 16011 | 0.385 |
3 | 54011 | 0.380 |
2 | 21981 | 0.375 |
Price($) | Vol. | No. |
---|---|---|
0.400 | 10000 | 1 |
0.405 | 24011 | 2 |
0.410 | 55011 | 5 |
0.415 | 183011 | 4 |
0.420 | 137215 | 7 |
Last trade - 16.10pm 02/10/2024 (20 minute delay) ? |
Featured News
LRV (ASX) Chart |