For what it is worth: the Sul America de Metais (SAM) mine project in Brazil have estimates of US$1.2 billion for 420-480km of slurry pipeline.
Also there was this old news article back from 2012 about the proposition: " The pipeline will carry a slurry of water and iron ore fines to the port of Ilheus on the Atlantic and will add $600 million to the project’s cost estimated between $3.6 billion to $4.2 billion." (Massive new Brazil mine will pipe iron-water slurry 420 kilometres to coast - MINING.COM)
- Forums
- ASX - By Stock
- Ann: HIO BFS Expansion
For what it is worth: the Sul America de Metais (SAM) mine...
-
-
- There are more pages in this discussion • 57 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HIO (ASX) to my watchlist
|
|||||
Last
2.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $28.24M |
Open | High | Low | Value | Volume |
2.8¢ | 2.8¢ | 2.6¢ | $102.6K | 3.825M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 375951 | 2.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.8¢ | 1120719 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 375951 | 0.027 |
12 | 1301421 | 0.026 |
12 | 2314440 | 0.025 |
3 | 1201000 | 0.024 |
6 | 777366 | 0.023 |
Price($) | Vol. | No. |
---|---|---|
0.028 | 1120719 | 4 |
0.029 | 1125374 | 4 |
0.030 | 57000 | 2 |
0.031 | 534500 | 2 |
0.032 | 193080 | 3 |
Last trade - 15.53pm 04/07/2024 (20 minute delay) ? |
Featured News
HIO (ASX) Chart |