I think you can take this paragraph as a positive - the ground has just been upgraded.
Drilling results and performance, coupled with the passive seismic interpretation indicates a deeper than anticipated limestone basement and sporadic occurrences of a thin calcrete cap at shallow depths. Due to the deeper limestone basement the company has changed its drilling contractor to one with a larger, more suitable drilling rig. This will allow HVY to complete the 12,000 m drilling program prior to breaking for the end of the year and with minimal disruption to HVY’s plan of rapidly defining a resource and moving to the study phase of the project. Having this larger rig on site will also allow HVY to expand upon the existing program by targeting mineralisation both deeper and across a wider area of strike.
- Forums
- ASX - By Stock
- HVY
- Ann: HM Intercepted Outside Target Area, New Tenure Applied For
Ann: HM Intercepted Outside Target Area, New Tenure Applied For, page-5
-
- There are more pages in this discussion • 89 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HVY (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.415M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 30000 | 9.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.0¢ | 65040 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 30000 | 0.090 |
1 | 64247 | 0.088 |
1 | 29069 | 0.086 |
2 | 18847 | 0.085 |
2 | 83000 | 0.082 |
Price($) | Vol. | No. |
---|---|---|
0.100 | 65040 | 1 |
0.115 | 18000 | 1 |
0.120 | 27744 | 1 |
0.125 | 17707 | 1 |
0.170 | 10000 | 1 |
Last trade - 16.12pm 19/07/2024 (20 minute delay) ? |
Featured News
HVY (ASX) Chart |
Day chart unavailable