Hi Mondy
From stage 1 PFS this was the Capex
Total capex without contigency is US103m. I assumed that since the build is 1/3rd through and they are trying to find savings that the contigency amount would be less likely.
They said in todays anouncement that 33% have been spent so that leaves around US$70m required. I assumed the ATM and current cash balances and expected future savings will bring this down to only requiring a further US$60m (I was thinking it is conservative).
That is just how I understoof the anouncement today on already spent 33%. Happy to be proven wrong in my thinking.
- Forums
- ASX - By Stock
- GLN
- Ann: HMW Project Achieves 1,000t LCE Contained Inventory
Ann: HMW Project Achieves 1,000t LCE Contained Inventory, page-34
-
- There are more pages in this discussion • 41 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GLN (ASX) to my watchlist
|
|||||
Last
13.5¢ |
Change
-0.005(3.57%) |
Mkt cap ! $66.00M |
Open | High | Low | Value | Volume |
14.0¢ | 14.3¢ | 13.5¢ | $209.5K | 1.508M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 521276 | 13.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
14.0¢ | 414577 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 102714 | 0.140 |
13 | 445884 | 0.135 |
23 | 700955 | 0.130 |
7 | 676034 | 0.125 |
10 | 385266 | 0.120 |
Price($) | Vol. | No. |
---|---|---|
0.110 | 2049 | 1 |
0.130 | 75000 | 1 |
0.135 | 20394 | 2 |
0.140 | 414233 | 1 |
0.145 | 296715 | 5 |
Last trade - 16.10pm 31/07/2024 (20 minute delay) ? |
Featured News
GLN (ASX) Chart |
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO
Anthony Noble
CEO
SPONSORED BY The Market Online