Ann: Holdgate-1 Drill Update 18 June 2012 , page-7

  1. 8,830 Posts.
    lightbulb Created with Sketch. 1711
    That was no earthquake, it was the hot air coming from the drillings as there is no oil in them wells, and BA swearing when told the latest well was a dud

    this is NOT BASED ON FACT and not meant to be anything except a joke


    DYOR
 
watchlist Created with Sketch. Add AJQ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.